Fpso mooring hook up

fpso mooring hook up

How do you hook up a FPSO boat?

FPSO-FSO MOORING HOOK UP PROCEDURE Normally FPSO are hooked-up by mooring chains at ballast draft, with level trim. Based on ballast draft loading condition, the final pretension of the mooring lines shall be set to calibrated 10 to 15% of mooring chain maximum breaking loads. As 100 % loa

What is the purpose of hook up mooring?

Mooring General Arrangement of the Hook-Up ​Lead tugs are used to tow the FPSO to site, while the stern tugs are used to stabilize the FPSO fishtailing during sailing and installation. Installation Vessels used on site to recover the chains and ensure the connection of the chains with the FPSO.

What is FPSO-FSO turret mooring?

FPSO-FSO TURRET MOORING DESIGN & INSTALLATION ​​The FSO conversion is done by modifying tanker in bow or in midship. External turret mooring system are employed by modifying tanker in the bow area. The FSO are mooring by even number of mooring chains i.e 6,8,12 depending on mooring requirements and commercial viability.

How to hook up FPSO to mooring chains?

​ Normally FPSO are hooked-up by mooring chains at ballast draft, with level trim. Based on ballast draft loading condition, the final pretension of the mooring lines shall be set to calibrated 10 to 15% of mooring chain maximum breaking loads.

How to hook up mooring lines to the FPSO?

The following sequence is to be used to hook-up each mooring lines to the FPSO. Retrieve mooring line end using the subsea or pennant buoy (at the line end location). Chain end is recovered and locked onto the installation vessel.

What is a FPSO vessel?

It stands for floating production storage and offloading (FPSO). These vessels are used extensively by the offshore industry and have become one of the primary methods of oil and gas processing and storage.

What is the general hook-up procedure of FPSO?

General Hook-Up Sequence ​The general hook-up procedure is as follow: On-site, the positioning tugs are used to guide the FPSO to final location in order to start connection of the mooring lines. Assisting installation vessel is used to pick up the lines and help transfer the chains to the FPSO.

How to offload oil from FPSO to shuttle tanker?

When a shuttle tanker is chosen to transport the oil, the offloading of oil from FPSO to the shuttle tanker can be carried out by using an offloading buoy. Alternatively, oil can be transferred from the FPSO to the tanker directly through tandem or side-by-side arrangements.

How to hook up mooring lines to the FPSO?

The following sequence is to be used to hook-up each mooring lines to the FPSO. Retrieve mooring line end using the subsea or pennant buoy (at the line end location). Chain end is recovered and locked onto the installation vessel.

What is the purpose of hook up mooring?

Mooring General Arrangement of the Hook-Up ​Lead tugs are used to tow the FPSO to site, while the stern tugs are used to stabilize the FPSO fishtailing during sailing and installation. Installation Vessels used on site to recover the chains and ensure the connection of the chains with the FPSO.

How do you secure a mooring chain?

After laying each mooring chain, the end of it shall be secured with a pennant to it with a surface marker buoy, with the number of the chain marked on the buoy. Another way is to secure a subsea beacon to the end of the chain which can be subsequently interrogated and the connection made to the end of the chain using an ROV.

How many mooring chains are there in an FSO?

The FSO are mooring by even number of mooring chains i.e 6,8,12 depending on mooring requirements and commercial viability. Risers are attached from chain table to PLEM.